Loading
  • HYDRON
    • METANOL
    • AMONIACO
  • PROYECTOS
  • CONTACTO
  • I+D+I
  • Español
  • HIBRIDACIÓN DE BATERÍA (copy)
  • NOSOTROS
  • INICIO
more than de 30

projects under development

more than 1.800 MWp

of photovoltaic power

more than 1.400 MW

electrolysing power

We work on the development of projects that promote the use of clean and renewable energies such as green hydrogen and solar energy. Our mission is to reduce our carbon footprint and encourage the use of responsible energy for a greener future.

Previous Previous Previous Next Next Next
123456
Open image in lightbox: galery 10 Open image in lightbox: galery 10
Alhonoz - Sevilla
Open image in lightbox: galery 9 Open image in lightbox: galery 9
Antequera - Málaga
Open image in lightbox: galery 6 Open image in lightbox: galery 6
Guadix - Granada
Open image in lightbox: galery 3 Open image in lightbox: galery 3
Los Palacios - Sevilla
Open image in lightbox: galery 8 Open image in lightbox: galery 8
Jerez de la Frontera - Cádiz
Open image in lightbox: galery 5 Open image in lightbox: galery 5
Utrera - Sevilla

In Andalucía

Andalusia is a region in full expansion that combines its rich history and cultural heritage with a firm commitment to innovation and sustainable development. Our ongoing projects are committed to contributing to the development of the region and making it a benchmark for the future.

9 Projects

At different stages of development

more than 405 MWp

power electrolysis

more than 33.800 ton/year

estimated hydrogen production

Featured project

LADIHONDA I project - Granada

Photovoltaic power: 70 MWp

Distance to grid: 10 km

Electrolysis power: 40 MWp

Distance to gas grid (in a straight line): 2.8 km

Estimated annual water consumption: 125.000 m³

Format: Mixed

Estimated annual hydrogen production: 6,000 tonnes

Investment: 77.2 million euros

State of processing: 100%.

Distance to town centre: 8 km to the nearest town Guadix

Distance to roads: 7 km to N-342 and 9 km to A-92

In Extremadura

Extremadura is a region of Spain with a strong commitment to sustainable development and innovation in various sectors, including renewable energy. That is why Ansasol is firmly committed to having a presence in the region and to contributing to its economic and social development.

7 Projects

At different stages of development

more than 295 MWp

power electrolysis

more than 17.500 ton/year

estimated hydrogen production

Featured project

TORREJONCILLO project - Cáceres

Photovoltaic power: 160 MWp

Distance to grid: 8 km

Electrolysis power: 100 MW

Distance to gas grid (in a straight line): 12 km

Estimated annual water consumption: 264.000 m³

Format: Self-consumption

Estimated annual hydrogen production: 2,040 kg/h of hydrogen in 24h regime.

Investment: 240 million euros

Estado de tramitación: 5%

Castilla La Mancha

Castilla-La Mancha is one of the leading regions in Spain in the development of renewable energies, taking advantage of its abundance of natural resources such as solar radiation. The region has focused its efforts on fostering the transition towards a more sustainable energy model, with significant growth in the solar energy and, more recently, green hydrogen sectors.

5 Projects

At different stages of development

more than 330 MWp

power electrolysis

more than 27.200 ton/year

estimated hydrogen production

Featured project

CAÑADA MEDIANA project - Cuenca

Photovoltaic power: 69 MWp

Distance to grid: 22 km

Electrolysis power: 40MW

Estimated annual water consumption: 125,000 m³

Format: Mixed

Estimated annual hydrogen production: 6,000 tonnes

Investment: 90.14 million euros

State of processing: In process

Distance to town centre: 1 km

Distance to roads: 0 km to CUV-7121

En Castilla y León

Castilla y León has implemented several plans to promote renewable energies and meet the European Union’s decarbonisation targets. These include the Renewable Energy Plan and the Energy Transition Plan, which seek to increase the share of clean energy in the regional energy mix and improve energy efficiency.

12 Projects

At different stages of development

more than 550 MWp

power electrolysis

more than 60.900 ton/year

estimated hydrogen production

Featured project

EL CUARTEL project - Burgos

Photovoltaic power: 185 MWp

Distance to grid: 500 m

Electrolysis power: 130 MW

Distance to gas grid (in a straight line): 7.5 km

Estimated annual water consumption: 400,000 m³

Format: Mixed

Estimated annual hydrogen production: 19,300 tonnes

Investment: 278.2 million euros

State of processing: Internal development

Distance to town centre: 5 km to Pinilla Transmonte and 3.5 km to Oquillas

Distance to roads: Adjoins BU-V-9203 and links up with the northern motorway or A-1 at 3.5 km.

© Copyright - Ansasol - Enfold Theme by Kriesi
  • GDPR
  • Legal notice
  • Privacy policy
  • LSSI
Scroll to top Scroll to top Scroll to top